 |
Coyote Wells is well underway.......this is the new
panel with the switches installed for the turnouts. They have been
installed for years. They operated with out a hitch. |
 |
Just a shot of the wiring........much more to come. |
 |
Got the wiring in for the relays, that means we
have track power! |
 |
This is a shot of Coyote Wells, and the Branch
Line rails. |
 |
Another shot of Coyote Wells. With a Pacific
Desert Lines Locomotive sitting on the Branch Line rails. |
 |
Here we are looking at Coyote Wells from Carrizo Gorge. |